Round-the-clock construction of three gas pipelines continues: “Tandircha CP – Shurtanneftegaz” (45 km), “Chigil CP – Mubarek GPP” (110 km), “Talimarjon CP – Shurtanneftegaz” (8 km).

Total for December 20:

  • 49,100 t of pipes shipped;
  • 30,200 t of pipes arrived;
  • 93.4 km of trenches dug;
  • 119.2 km of pipes welded;
  • 75.9 km laid.