Construction of “Chigil CP – Mubarek GPP” gas pipeline in cooperation with Uzbekneftegaz continues.
Total as of February 21:
- 159,100 t of pipes shipped;
- 154,200 t of pipes arrived;
- 194.4 km of trenches dug;
- 232.4 km of pipes welded;
- 128.2 km laid.
Epsilon Development Company (EDC) Press Office