EPSILON (EDC): Developing gas transmission infrastructure

BUSINESS 19:00 / 21.02.2020 1231

Construction of “Chigil CP – Mubarek GPP” gas pipeline in cooperation with Uzbekneftegaz continues.

Total as of February 21:

  • 159,100 t of pipes shipped;
  • 154,200 t of pipes arrived;
  • 194.4 km of trenches dug;
  • 232.4 km of pipes welded;
  • 128.2 km laid.

Epsilon Development Company (EDC) Press Office

More news: