Construction of “Chigil CP – Mubarek GPP” dual-string pipeline with a design length of 110 km continues in cooperation with Uzbekneftegaz.
Total as of February 4:
- 145,400 t of pipes shipped;
- 114,400 t of pipes arrived;
- 184.3 km of trenches dug;
- 224.1 km of pipes welded;
- 127.6 km laid.
Epsilon Development Company (EDC) Press Office