EPSILON (EDC): 24/7 gas pipeline construction

BUSINESS 18:55 / 04.02.2020 957

Construction of “Chigil CP – Mubarek GPP” dual-string pipeline with a design length of 110 km continues in cooperation with Uzbekneftegaz.

Total as of February 4:

  • 145,400 t of pipes shipped;
  • 114,400 t of pipes arrived;
  • 184.3 km of trenches dug;
  • 224.1 km of pipes welded;
  • 127.6 km laid.

Epsilon Development Company (EDC) Press Office

More news: