EPSILON (EDC): Expanding gas transmission infrastructure in cooperation with Uzbekneftegaz

BUSINESS 20:55 / 28.01.2020 1081

Construction of “Chigil CP – Mubarek GPP” gas pipeline continues.

Total for January 28:

  • 135,900 t of pipes shipped;
  • 94,100 t of pipes arrived;
  • 164.1 km of trenches dug;
  • 218.6 km of pipes welded into a string;
  • 126.3 km laid.

EPSILON (EDC) Press Office

More news: