Construction of “Chigil CP – Mubarek GPP” gas pipeline continues.
Total for January 28:
- 135,900 t of pipes shipped;
- 94,100 t of pipes arrived;
- 164.1 km of trenches dug;
- 218.6 km of pipes welded into a string;
- 126.3 km laid.
EPSILON (EDC) Press Office