EPSILON: Developing gas pipeline network in Kashkadarya region

BUSINESS 18:23 / 24.01.2020 502

Construction of “Chigil CP – Mubarek GPP” pipeline is underway. The works are being carried out around the clock in cooperation with Uzbekneftegaz.

Total for January 24:

  • 126,900 t of pipes shipped;
  • 84,900 t of pipes arrived;
  • 159.4 km of trenches dug;
  • 212.3 km of pipes welded into a string;
  • 126.3 km laid.

EPSILON Press Office

More news: