Construction of “Chigil CP – Mubarek GPP” pipeline is underway. The works are being carried out around the clock in cooperation with Uzbekneftegaz.
Total for January 24:
- 126,900 t of pipes shipped;
- 84,900 t of pipes arrived;
- 159.4 km of trenches dug;
- 212.3 km of pipes welded into a string;
- 126.3 km laid.
EPSILON Press Office