Overall, the company built and connected 10 gas pipeline strings with a total length of 250 km, and 23 gas flowlines (44.2 km).
Construction of “Chigil CP – Mubarek GPP” pipeline is in progress. The works are being carried out in cooperation with Uzbekneftegaz.
Total for January 23:
- 125,900 t of pipes shipped;
- 83,600 t of pipes arrived;
- 156.2 km of trenches dug;
- 210.3 km of pipes welded into a string;
- 126.3 km laid.