EPSILON: Expanding gas pipeline system in cooperation with Uzbekneftegaz

BUSINESS 16:59 / 17.01.2020 1072

Round-the-clock construction of “Chigil CP – Mubarek GPP” pipeline is in progress.

Total for January 17:

  • 98,400 t of pipes shipped;
  • 72,700 t of pipes arrived;
  • 140.4 km of trenches dug;
  • 191.9 km of pipes welded;
  • 121.2 km laid.

EPSILON Press Office

More news: