On December 28, following hydraulic fracturing, the total daily flow rate of Khojiqazgan-4 and Doya Khatun-68 reached 200,000 m³ of natural gas.
The production rate of Khojiqazgan-4 well increased from 37,000 to 80,000 m³ of gas per day.
The flow rate of Doya Khatun-68 well increased from 72,000 to 120,000 m³ of gas per day.
Construction of two gas pipelines continues: “Tandircha CP – Shurtanneftegaz” (45 km) and “Chigil CP – Mubarek GPP” (110 km).
Total for December 28:
- 63,100 t of pipes shipped;
- 42,500 t of pipes arrived;
- 118.2 km of trenches dug;
- 134.8 km of pipes welded;
- 114.7 km laid.