A horizontal well with a length of 205 m was drilled at Khudjum field, followed by hydraulic fracturing. These operations – completed on a tight schedule – allowed increasing the well’s daily production rate that reached 700,000 m³.
The obtained inflow of natural gas expands the field’s producing limits and helps supply the population with hydrocarbons.
EPSILON Press Office