EPSILON: Expanding gas pipeline network in Kashkadarya region in cooperation with Uzbekneftegaz

BUSINESS 20:23 / 18.12.2019 418

Round-the-clock construction of three gas pipelines continues: “Tandircha CP – Shurtanneftegaz” (45 km), “Chigil CP – Mubarek GPP” (110 km), “Talimarjon CP – Shurtanneftegaz” (8 km).

Total for December 18:

  • 46,200 t of pipes shipped;
  • 29,700 t of pipes arrived;
  • 90.8 km of trenches dug;
  • 114.7 km of pipes welded;
  • 74.3 km laid.

EPSILON Press Office

More news: